Step 5: Schedule the final inspection
To make sure your system has been repaired properly, Public Health staff will need to complete a final inspection of your system before it is covered with soil. Your permit may also specify that your design engineer must also inspect your system.
You can make an appointment for the final
inspection by calling our office at 303-441-1564. Our staff is available Monday through Friday from 8 a.m. to 5 p.m.
If all of the conditions of the permit have been met we will
approve your system and mail a Certificate of Final Approval to the
property owner.
Your Certificate of Final Approval is your assurance
that your system, with proper maintenance, is built to protect our