95th Street Shoulder Widening Project
This project consists of roadway shoulder widening
and resurfacing on 95th Street in cooperation with the City of
Lafayette. The existing roadway will be widened along the west
edge of existing pavement to provide for a 5' wide paved asphalt
shoulder for southbound traffic. Work will take place within the
existing road right-of-way with no additional right-of-way required.
The project location is on 95th Street beginning
approximately 1/4 mile north of Arapahoe Road extending 1800' to the
Lafayette city limits.
Construction is expected to begin in the late summer
or fall of 2008 and take approximately 1 month for completion.
During the project, the roadway will remain open with minor traffic
delays.
Contact Andy Reed at (720) 564-2651 for the most
current information.
|