N. 63rd Street Bridge Replacement Over Lefthand Creek
The County, in collaboration with the State of Colorado,
will be utilizing Federal funding to replace the narrow bridge over
Lefthand Creek with a wider bridge capable of conveying the 100-year
flood event and reducing the extent of the floodplain in adjacent areas.
Design is scheduled for completion in the fall of 2008
with construction beginning as early as November 2008. Please call
Pam Hanson at (720) 564-2652, or email at
phanson@bouldercounty.org
for more details.
|