State highway 7 at East County Line Intersection
Improvements
The project is to add traffic signals at this
intersection and to add turn lanes to both East County Line Road and SH
7. Additionally, access restrictions will be constructed to limit
traffic movements at Flagg Drive to a right turn in and right turn out
condition. A majority of the work is expected to take place within
the existing road rights-of-way. This project is being constructed
in conjunction with Colorado Department of Transportation and the City
of Lafayette.
Construction will take place along SH 7 beginning
approximately 1000' west from the East County Line Road intersection to
a point 700' east of the intersection. Work on East County Line
Road will be approximately 900' in length.
The project is currently in the design process.
Construction is expected to begin in the late summer 2008 and take
approximately 2 months for completion. During the project the
roadway will remain open with minor traffic delays.
Contact Andy Reed at (720) 564-2651 for the most
current information.
|