North 83rd Street Flood Recovery – Permanent Construction

North 83rd Street Flood Recovery - Permanent Construction

The North 83rd Street bridge over the Little Thompson River was destroyed during the 2013 flood event. Temporary culverts and a road were built post-flood. These structures were replaced with a new bridge in 2016.

The project constructed a new 250′ long by 38′ wide bridge that will withstand a 100-year flood event. The previous bridge that was washed out was 64′ long by 28′ wide and was rated to withstand a 10-year flood event.

ROAD/BRIDGE IS OPEN

Construction of the new bridge over the Little Thompson is ongoing, but the road/bridge is open to the public. The traveling public may still experience short delays if equipment is in the roadway.

Project Contacts:

Completed Project Photos:

Contact Us

Public Works Department (formerly Transportation)

303-441-3900
Submit a request
Email

Location

2525 13th Street
Boulder, CO 80304

Map & Directions

Hours: 8 a.m. - 4:30 p.m. M-F

Mailing Address

P.O. Box 471
Boulder, CO 80306